How Long Does a Kitchen Remodel Take? Timeline & Stages Explained

If you’ve decided it’s time to give your kitchen a fresh new look, one of the first questions that comes to mind is: “How long will this take?” Whether you’re a homeowner designing your dream space or a real estate investor looking for a quick turnaround, understanding the kitchen remodeling timeline is essential for setting realistic expectations.

While every project is different, the duration of a kitchen remodel generally depends on the scope of work, the size of the kitchen, the availability of materials, and how quickly decisions are made. Here’s a detailed breakdown of what you can expect from start to finish.

1. Planning & Design Phase (2–6 Weeks)

Before demolition begins, you’ll spend time working with a designer or contractor to:

  • Finalize your kitchen layout and traffic flow
  • Choose cabinetry styles, countertop materials, flooring, appliances, and lighting
  • Obtain necessary permits from your local building department

This stage is critical because it sets the tone for the entire project. Rushed planning often leads to costly changes later. The more decisions you make early—like finalizing your backsplash tile or appliance model—the smoother your remodel will go.

2. Ordering Materials (2–8 Weeks)

Cabinets, specialty countertops, and custom fixtures often have long lead times. Many remodelers recommend ordering all major materials before construction begins to avoid mid-project delays.

For example:

  • Stock cabinets might arrive in 2–3 weeks
  • Semi-custom cabinets could take 4–6 weeks
  • Fully custom cabinets might require 8–12 weeks

The same applies to high-end appliances, which may be backordered. Securing your orders early ensures a more predictable schedule.

3. Demolition (1–2 Weeks)

This is where the transformation begins—out with the old! Your contractor will remove existing cabinets, countertops, appliances, and sometimes flooring or even walls.

If demolition reveals hidden problems—such as water damage, mold, or outdated electrical wiring—these issues must be addressed before moving forward with kitchen remodeling. While this can add time, it’s better to fix them now than face bigger problems later.

4. Construction & Installation (4–8 Weeks)

This stage includes:

  • Electrical and plumbing updates to meet current codes
  • Drywall installation, priming, and painting
  • Cabinet installation followed by countertop templating and fitting
  • Flooring and backsplash installation
  • Appliance delivery and hook-up

The complexity of your remodel plays a huge role here. A simple cosmetic refresh with new counters and paint may be completed in a month, while a full gut-and-rebuild with structural changes can take twice as long.

5. Final Touches & Inspections (1–2 Weeks)

Once all major work is complete, your contractor will handle finishing details like trim, hardware, caulking, and final paint touch-ups. Then, local inspectors will review the work to ensure it meets building codes and safety standards.

Pro Tip: Keep a short “punch list” of any small issues you notice so they can be addressed before final sign-off.

Total Timeline: 2 to 6 Months

On average, a kitchen remodel takes 8–12 weeks from demolition to completion. However, when you include planning, design, ordering, and inspections, the total timeline can stretch to 2–6 months.

Larger projects, especially those involving custom work or major layout changes, will take longer. But with proper planning, you can keep the process efficient and avoid unnecessary delays.

Bottom Line:

A kitchen remodel is a major undertaking, but it’s also one of the most rewarding home improvements you can make. The key to staying on schedule is planning ahead, ordering materials early, making timely decisions, and working with an experienced remodeling team. By understanding the process and building in a little flexibility, you’ll be enjoying your dream kitchen before you know it.